Description & Technical information
Date: 2013
Period: 21st century
Origin: China
Medium: Ink on paper
Dimensions: 192.5 x 280.5 cm (75³/₄ x 110³/₈ inches)
Categories: Oriental and Asian Art, Paintings, Drawings & Prints

Discover the gallery
Michael Goedhuis
Chinese Contemporary Ink Painting, Chinese & Japanese Works of Art
More Works From This Gallery

Michael Goedhuis
Section of Wind in Pines Among a Myriad of Valleys after Li Tang
Guan Zhi (1970)

Michael Goedhuis
Japanese Bronze Flower Vessel with Gilt Gold Flowers

Michael Goedhuis
Energy in Transit Series No 6
Ying Hu (Beijing, 1950)